'clock, bulldozers unloading, excavation and backfilling earthwork Sinotrans and other work smoothly. Have all been filled pit, bulldozers had dropped to 2.5 meters, more than 12,000 square filled pit, unloading more than 13,000 square soil. From yesterday, the day before yesterday 13:00 to 18:00, 29 hours of Sinotrans earthmoving vehicles more than 8900 square meter 510. Meanwhile, Dianpuhe flood wall repair work is also underway, the current total clean uninstall the collapse of more than 12,000 square flood wall earthwork, demolition of the dangerous section of the flood prevention wall 75 meters, the construction of temporary flood wall 170 meters. Water will be carried out today cofferdam. To speed up the rescue progress, in time before the flood repair flood wall, headquarters decided from yesterday until July 12th consecutive day and night construction, will reduce the losses to a minimum. Panel gives preliminary observations lead to building back cover mainly due to improper construction WASHINGTON reporter Gu Zhuomin "a construction unit with common sense would not make such a mistake." Yesterday, the reporter contacted responsible for Lotus Riverside back cover events in the construction of buildings survey panel members learned that the current expert opinion has been given a preliminary report, which states that lead to real estate back cover of the main factors is improper construction, bulldozers too high on one side and the other side of the excavation pit together, resulting in an instant rise back cover. It is reported that expert investigation team has access to engineering survey reports, design drawings and other relevant information, and back cover building materials, cement and steel and other key were sampled, and experimental analysis. Yesterday, the reporter learned from the expert group, a report on the Lotus Riverside incident report has been released preliminary observations. The report mainly involves three aspects, namely: overall assessment of the status quo cause of the accident analysis and to carry out further work. "In our overall assessment of the scene of the accident situation, the current scene rescue measures taken are effective." Members of the Group, said: "After the accident, the rescue team bulldozers overnight emergency clean-up, and the excavation pit to do backfill in a timely manner, the current situation is stable scene. "concern for the public in general cause of the accident, the report of the Expert Group is also a detailed analysis and explanation. According to the panel members said, the real estate side of the back cover nearly 10 meters of earth piled up, forming the foundation for real estate oppressive force, coupled with the other side of the building in the excavation pit (underground garage), because pit containment measures in place, in the dual role of the force resulting building collapsed. For reporters that "flood wall cracking or other circumstances of particular geological sur accident is not a predisposing factor" issues, the experts clearly said: "These are objective reasons are not the root cause of the accident, a construction unit with common sense should not be guilty of such wrong. "on the next phase of work, the experts stressed:" Things have happened, and now the lessons learned, prevention is very important, after all, a 13-story building suddenly back cover is unheard of, illegal heap soil, improper excavation pit,

É necessário se cadastrar para acessar o conteúdo.
, these accidents before, we are not taken seriously enough. Now, through this painful lesson, hope that all construction units warning and hope industry associations can play an active role. "site visit Luo Yang seven residents of the village to restore the "entertainment" money first peak intern Taosi Jia WASHINGTON Yesterday, reporters once again came to the Lotus Riverside accident site and found several large excavator is still the scene filled pit,
É necessário se cadastrar para acessar o conteúdo.
, dump work,
É necessário se cadastrar para acessar o conteúdo.
, and the relevant departments also real estate housing structure, piles were tested. In addition, suffer from a "shock" in Luo Yang seven residents of the village in the district back to life after work is carried out methodically, 19:00, the reporter also saw elderly activity in the cell interior, the elderly are happy to carry out recreational activities. "Today, to set aside several people, all district and the city related sector experts, the housing is probably to be tested, the hand holding a variety of instruments." Lotus Riverside periphery still stopping cordon,
É necessário se cadastrar para acessar o conteúdo.
, the door has been locked the site, the site responsible for the janitor workers told reporters, excavators have been kept at work,
É necessário se cadastrar para acessar o conteúdo.
, and continue to have shipped out earthworks. . The night before home Luoyang seven residents of the village were also gradually restored calm, originally set up in the district north gate of the two cordon had been evacuated, closed shops along the road re-opened two days later. Elderly activity room downstairs, the elderly also danced a fan dance, entertainment Xing is strong. City of diplomatic relations committee director web chat back cover floor began to eliminate the possibility of secondary disasters Yesterday, the City of Construction and Transportation Commission Director Huang Rong online chat with the public via LONDON, revealed through multiple departments with treatment,
É necessário se cadastrar para acessar o conteúdo.
, Minhang back cover accidents around the floor the possibility of secondary disasters house now eliminated, has started investigation. He said that for the cause of the accident analysis must be acceptable to the people, but also to give people a comfort. In an interview yesterday, one hour, many people have expressed an accident on the floor, Minhang back cover of attention. Huang Rong said that the handling of this incident, as far as possible in the field, because in addition to outside the house collapsed, the event is also related to the impact on the surrounding buildings, will produce some hazards. Authorities set up an expert group on the analysis of the causes of this group of experts in the field primary task is to resolve the (dangerous) to provide some technical solutions and technical support. While on-site forensic investigation, looking for the cause of the accident behind the analysis basis. These efforts should be said that all the incident handling process is essential. At present, the various departments concerned, through the efforts of the past two days,
É necessário se cadastrar para acessar o conteúdo.
, and now the possibility of secondary disasters caused by the reduction are beginning to eliminate. Minhang surrounding residents are starting to come home the night before. House for back cover accidents caused by public concerns for underground excavation, Huang Rong said that the public need not worry too much, the recent large-scale construction in Shanghai rail transit, especially underground structures and high-rise buildings during the excavation of underground space, diplomatic appoint a specially formulated strict rules, that is, for deep foundation excavation, diplomatic relations committee, CST requires experts to review all aspects of the same time, strengthen supervision during excavation and testing to ensure the safety of the surrounding houses . Many people feel this heart a lot of buildings collapsed, Shanghai has so many buildings,
É necessário se cadastrar para acessar o conteúdo.
, exactly how to ensure safety Huang Rong said that as a department, will this incident replicability, lessons learned. Strengthen management Duanjinqueliang steel lintel should never be used by the market WASHINGTON DR various factors, the city construction of reinforced concrete with steel (referred bars) there is a serious quality Duanjinqueliang phenomenon, in order to ensure the quality of construction of engineering structures , the implementation of construction quality assurance responsibilities of all parties involved, yesterday, the Urban Construction Engineering Quality Supervision Station Security issued a notice, will strengthen the on-site bar quality testing management. It is reported that there is a serious Duanjinqueliang quality steel, mainly for the size and weight of steel products do not meet the standard deviation and the seismic performance failure, despite repeated rectification has improved,
É necessário se cadastrar para acessar o conteúdo.
, but have not yet been fundamentally curbed. Notification requirements for entering the construction site of steel, construction units in the sample sent for testing unit for re-examination of reinforced mechanical properties of raw materials on the basis of raw materials needed to simultaneously reinforced weight deviation retest,
É necessário se cadastrar para acessar o conteúdo.
, retest indicators and product quality acceptance should meet the relevant requirements. Reinforcement approach may not be used without a quality inspection, quality unqualified acceptance shall not be used. (Source: Youth Daily)

相关的主题文ç«*:

 

 

É necessário se cadastrar para acessar o conteúdo.

 

É necessário se cadastrar para acessar o conteúdo.

 

É necessário se cadastrar para acessar o conteúdo.

Link para o comentário
Compartilhar em outros sites

Este tópico está impedido de receber novos posts.
 Compartilhar

×
×
  • Criar Novo...

Informação Importante

Nós fazemos uso de cookies no seu dispositivo para ajudar a tornar este site melhor. Você pode ajustar suas configurações de cookies , caso contrário, vamos supor que você está bem para continuar.